top of page

DESIGN REVIEW COMMITTEE

The Design Review Committee (DRC) coordinates with homeowners about exterior changes or additions to homes or property. The committee ensures that proposed changes are in line with the conditions and restrictions of the HOA covenants. (see Article XI General Restrictions starting on page 14 - 23.)

Before starting an exterior home improvement project such as a fence, dog run, swimming pool, deck enclosure, retaining wall, hot tub, gazebo, or other structure, you must submit a written plan to the DRC.


Design Review Committee

Tim Dougherty

Jennifer Snider

Jennifer EdlinRobin Rogers


​

SUBMIT YOUR REQUEST

Please describe your project providing the information listed below and submit to the DRC via email or mail. Please allow at least 14 days notice prior to the start of your project.

Click here for Request form

​

DRC Vintage

PO Box 1580

Platte City, MO 64079

hoa.thevintage@gmail.com


Requests MUST Include:

    • Resident's Name

    • Resident's Address

    • Resident's contact email and phone number

    • Nature of Request (pool, fence, etc.)

    • Detailed Description of change which includes but is not limited to color, material, size, location, etc). Don't forget to include paint swatches when applicable.

    • ALL required paperwork must be attached, including Permits from the City of Smithville.

**Requests must be submitted at least 14 days prior to the start of any project. This allows the DRC time to review your request.**

*Failure to submit all information will result in delayed approval and/or rejection until all information is provided.

* Work MUST NOT begin until approval has been obtained. Failure to do so may result in the work being restored to the original state at the owner's expense.

Design Review: About Us
bottom of page